Sports & Entertainment · 2025

Multipurpose Arena and Events Center

An 18,000-seat arena with a long-span roof and a rigging grid for touring productions, ready for an opening event booked before steel was bought.

Owner
Confidential
Location
U.S.
Our role
Construction manager at-risk
Delivery
CM at-risk
Scale
18,000 seats
Completed
2025
The brief

An 18,000-seat arena with a long-span roof and a rigging grid for touring shows, delivered against an opening event that was booked before the steel was bought.

The opening event was announced early, so the date was fixed before design was finished. The long-span roof trusses had to be fabricated, delivered and lifted in a tight window. The rigging grid had to carry heavy touring loads, and the seating bowl, scoreboard, broadcast cabling and food service all had to be complete and tested for a full house.

How we built it

The approach.

  1. 01

    Steel bought on early packages

    Mill orders and truss fabrication were released on early bid packages, with fabrication progress tracked weekly against the erection plan.

  2. 02

    Roof lifted in a planned sequence

    Trusses were assembled at grade and lifted in a sequence that let the bowl and interior trades work beneath without stopping.

  3. 03

    Critical path reviewed every week

    The owner saw the path to the opening event every week, with float on each remaining milestone and the decisions needed to protect it.

  4. 04

    Test events before opening

    Two full test events ran ingress, concessions, broadcast and life safety with staff before the first ticketed show.

The outcome.

18,000Seats
2Full test events before opening
120 tRigging grid capacity
On dateOpening event

“Once the opening was on sale, the date stopped being ours to move. We showed the owner every week how much float was left.”

Project executive, Jacob Wiseman