Construction · General contracting · Construction management Project controls built in CareersMediaPartnershipsProject map
Development · Mixed-Use

Districts that work at street level.

Vertical and horizontal mixed-use projects where homes, offices, retail and public space share structure, systems and a single schedule.

What owners need from us.

01

Several buildings in one

Residential, office and retail each carry their own code, structure and systems. They meet at transfer slabs, shafts and shared loading docks.

02

Retail at grade sets the tone

Storefronts need tall clear heights, grease and exhaust routes and flexible utilities, all ready before tenants are known.

03

The public realm opens with it

Streets, plazas, parks and utilities are often public commitments with their own approvals and their own dates.

Mixed-Use

What we build.

  1. 01

    Vertical mixed-use

    Residential or office floors over retail and parking, with transfer structures and separated systems.

  2. 02

    Master-planned districts

    Multiple buildings, new streets and shared infrastructure delivered in phases.

  3. 03

    Retail and restaurant shells

    Grade-level storefronts with utility stubs, exhaust shafts and tenant-ready slabs.

  4. 04

    Plazas, parks and streetscape

    Public realm, hardscape and landscape built to the standards of the city that will own it.

How we deliver here.

The capabilities owners in this market rely on most.

Construction ManagementDeliver

CM at-risk with a guaranteed maximum price for each phase as the district takes shape.

Civil & InfrastructureBuild

Our crews build the new streets, utilities and site grading that every building depends on.

Virtual Design & ConstructionPlan

Transfer levels, retail exhaust and shared shafts coordinated across building types.

Preconstruction & EstimatingPlan

Phase-by-phase budgets that match the way the developer finances each parcel.

In practice · Old warehouses, one new quarter

Several buildings, one schedule.

Turning a group of old warehouses into a mixed-use quarter under CM at-risk starts with laser scans of every building, because existing conditions drive the design. Reinforcement is hidden inside historic walls and floors, and each building turns over on its own date inside one master schedule, so the first tenants can open while work continues next door.

Scanned
Every existing building
1
Master schedule
Own date
Turnover per building

Questions owners ask us.

How do you handle different building types on one project?

We separate structure, systems and life safety by use in the model, then coordinate the places they meet, like transfer slabs and shared shafts, before construction.

Can retail tenants start before the building is finished?

Yes. We deliver retail shells with utility stubs and exhaust routes early, so tenant build-outs can run while upper floors finish.

Do you build the public streets and parks too?

We do. Our civil crews build streets, utilities and plazas to the city standard and coordinate inspections and acceptance with the agencies involved.

Mixed-Use

Planning a mixed-use project?

Send us your scope, target date and biggest concern. A senior Jacob Wiseman lead will read it personally.