Construction · General contracting · Construction management Project controls built in CareersMediaPartnershipsProject map
Civil & Infrastructure · Water & Environmental

Clean water, no interruptions.

Water and wastewater treatment, pump stations, storage and conveyance, built and started up while existing plants keep meeting their permits.

What owners need from us.

01

The plant must stay in permit

Flow keeps coming during construction. Bypasses, tie-ins and process shutdowns are planned so effluent stays within limits every day.

02

Startup is the finish line

A treatment plant is not done when the concrete cures. Equipment, controls and biology have to be started and proven together.

03

Funding comes with rules

Many projects use state revolving fund loans or grants. Reporting, sourcing and wage requirements have to be built into the controls before the first purchase order.

Water & Environmental

What we build.

  1. 01

    Water treatment plants

    Intake, filtration, membranes and disinfection, with clearwells and high-service pumping.

  2. 02

    Wastewater and reclamation

    Headworks, aeration basins, clarifiers, solids handling and reuse systems.

  3. 03

    Pump stations and storage

    Lift stations, booster stations, reservoirs and elevated tanks.

  4. 04

    Pipelines and conveyance

    Transmission mains, interceptors and force mains, open cut or trenchless.

How we deliver here.

The capabilities owners in this market rely on most.

Engineer-Procure-Construct (EPC)Deliver

One contract from process design through startup and performance testing.

Self-Performed ConstructionBuild

Our own crews for process concrete, basins and yard piping.

Building SystemsBuild

Instrumentation, controls and SCADA integrated and tested before startup.

Preconstruction & EstimatingPlan

Phased tie-in plans and cost estimates that support funding applications.

In practice · A treatment plant built beside a live one

Every tie-in planned to the hour.

On a progressive design-build treatment plant, the utility sees open-book pricing at each design stage, and ozone generators and membrane racks are bought during design to protect the startup date. Tie-ins to the live system are made in short shutdowns planned with operators to the hour, each with a rollback step, and operator training is scheduled ahead of the state startup test.

Open book
Pricing at each design stage
To the hour
Shutdown and tie-in plans
1
Rollback step per tie-in

Questions owners ask us.

How do you keep an existing plant in permit during construction?

We plan every tie-in and shutdown with plant operators, use temporary bypass pumping where needed and schedule critical work in low-flow periods.

Do you handle startup and commissioning?

Yes. We test equipment and controls, then start up process trains with operators and stay through performance testing.

Can you work on projects funded by state revolving fund loans?

We can. We set up the reporting, sourcing and wage tracking those programs require before the first purchase order.

Water & Environmental

Planning a water & environmental project?

Send us your scope, target date and biggest concern. A senior Jacob Wiseman lead will read it personally.