Energy · Renewable Energy

Clean power, built to interconnect.

Solar plants, battery storage and wind balance-of-plant, delivered from first pile to commercial operation by teams who plan backward from the interconnection date.

What owners need from us.

01

The interconnection date rules

Grid access, offtake agreements and tax credit timing all hang on one energization date. Missing it costs more than any line item in the budget.

02

Scale multiplies small errors

Tens of thousands of piles and tracker rows mean a small layout or torque error repeats across the site. Quality checks have to keep pace with production.

03

Sites are remote and exposed

Long haul routes, limited water, heat, wind and storm water all shape laydown, crew access and the daily plan.

Renewable Energy

What we build.

  1. 01

    Utility-scale solar

    Pile driving, single-axis tracker installation, module setting, DC collection and inverter pads across large arrays.

  2. 02

    Battery energy storage

    Container and enclosure foundations, power conversion equipment, fire protection and medium-voltage tie-ins.

  3. 03

    Wind balance-of-plant

    Access roads, crane pads, turbine foundations and underground collection to the project substation.

  4. 04

    Collector substations and tie lines

    Step-up substations, gen-tie lines and the protection and metering the utility needs to accept power.

How we deliver here.

The capabilities owners in this market rely on most.

Engineer-Procure-Construct (EPC)Deliver

Turnkey EPC from geotechnical work and pile testing through energization and commercial operation.

Civil & InfrastructureBuild

Site grading, access roads, storm water controls and crane pads on large, remote sites.

Supply Chain ManagementPlan

Trackers, modules, inverters and main power transformers tracked from factory to laydown.

SustainabilityPlan

Erosion control, habitat protection and site restoration planned with the permit conditions.

In practice · A hydropower rehabilitation

Units rebuilt, the river kept running.

Rehabilitating a hydropower station inside a working dam means one unit is out while the rest keep generating. Each unit is isolated behind a cofferdam and pumped dry, rebuilt with a new turbine and generator, and returned to the grid after load rejection testing. Outage durations are the controlling resource, so lessons from each unit tighten the plan for the next.

1
Unit out at a time
Load rejection
Test before return to service
Unit by unit
Outage plan refined

Questions owners ask us.

How do you keep a large solar site on schedule?

We break the array into blocks with their own pile, tracker, module and electrical crews. Each block is inspected and turned over in sequence, so progress and quality are measured daily.

Do you build the substation and tie line too?

Yes. We build collector substations and gen-tie lines alongside the array and coordinate testing with the utility so the plant can energize on time.

Can you add battery storage to an existing plant?

Yes. We plan storage additions around the operating plant, with foundations, conversion equipment and tie-ins scheduled to limit lost generation.

Renewable Energy

Planning a renewable energy project?

Send us your scope, target date and biggest concern. A senior Jacob Wiseman lead will read it personally.