Buildings · Higher Education

Campuses that never stop teaching.

Science buildings, classrooms, residence halls and student life centers, built on active campuses around the academic calendar.

What owners need from us.

01

The calendar is the schedule

Move-in day, the first day of classes and commencement do not move. Our schedules are built backwards from them.

02

Labs are complex buildings

Fume hoods, exhaust, vibration control and process piping make research space one of the hardest building types to get right.

03

Students are everywhere

Pedestrian routes, deliveries and crane picks have to work around thousands of people walking through campus every day.

Higher Education

What we build.

  1. 01

    Science and research buildings

    Teaching labs, research suites, vivariums and the exhaust and air systems behind them.

  2. 02

    Academic and classroom buildings

    Lecture halls, active learning classrooms and faculty offices.

  3. 03

    Residence halls and dining

    Student housing and dining commons delivered for move-in weekend.

  4. 04

    Student life and recreation

    Unions, libraries and recreation centers that anchor campus life.

How we deliver here.

The capabilities owners in this market rely on most.

Design-BuildDeliver

One team for design and construction when the campus needs a building fast.

Virtual Design & ConstructionPlan

Lab exhaust, process piping and casework coordinated in 3D before installation.

Building SystemsBuild

Commissioning of lab air balance, fume hoods and building controls.

Facilities & Transition ManagementOperate

Equipment moves and lab activation planned with faculty and research staff.

In practice · A health sciences simulation center

A hospital in miniature, ready for the first cohort.

When a new nursing program has enrollment already open, the first day of classes is the deadline. Faculty set the clinical scenarios first, live medical gases and headwalls are placed where students work, and full dry runs in every suite are scheduled weeks before classes, with the decisions faculty owe us listed by date on the way there.

Faculty-led
Clinical scenarios first
Dry runs
In every suite before classes
Dated
Owner decision list

Questions owners ask us.

Can you work around exams and campus events?

Yes. We publish quiet periods for exams and commencement, and we schedule noisy work and crane picks around them.

How do you handle lab renovations next to active research?

We map vibration, exhaust and utility needs of neighboring labs first, then plan shutdowns with the researchers who depend on them.

Do you build residence halls on a fixed move-in date?

We do. Residence halls are scheduled backwards from move-in weekend, with furniture and punch complete before students arrive.

Higher Education

Planning a higher education project?

Send us your scope, target date and biggest concern. A senior Jacob Wiseman lead will read it personally.